menu
{ "item_title" : "Coast Guard", "item_author" : [" U. S. Government Accountability Office "], "item_description" : "The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and performance parameters. Last year, GAO reported that Deepwater had exceeded cost and schedule parameters, and recommended a comprehensive study to assess the mix of assets needed in a cost-constrained environment given the approved baseline was no longer feasible. GAO assessed the (1) extent to which the program is exceeding the 2007 baseline and credibility of selected cost estimates and schedules; (2) execution, design, and testing of assets; and (3) Coast Guard's efforts to conduct a fleet mix analysis. GAO reviewed key Coast Guard documents and applied criteria from GAO's cost guide. ", "item_img_path" : "https://covers2.booksamillion.com/covers/bam/1/97/464/307/1974643077_b.jpg", "price_data" : { "retail_price" : "24.99", "online_price" : "24.99", "our_price" : "24.99", "club_price" : "24.99", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Coast Guard|U. S. Government Accountability Office

Coast Guard : action needed as approved Deepwater Program remains unachievable: report to congressional committees.

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

"The Deepwater Program includes efforts to build or modernize ships and aircraft, including supporting capabilities. In 2007, the Coast Guard took over the systems integrator role from Integrated Coast Guard Systems (ICGS) and established a $24.2 billion program baseline which included schedule and performance parameters. Last year, GAO reported that Deepwater had exceeded cost and schedule parameters, and recommended a comprehensive study to assess the mix of assets needed in a cost-constrained environment given the approved baseline was no longer feasible. GAO assessed the (1) extent to which the program is exceeding the 2007 baseline and credibility of selected cost estimates and schedules; (2) execution, design, and testing of assets; and (3) Coast Guard's efforts to conduct a fleet mix analysis. GAO reviewed key Coast Guard documents and applied criteria from GAO's cost guide. "

This item is Non-Returnable

Details

  • ISBN-13: 9781974643073
  • ISBN-10: 1974643077
  • Publisher: Createspace Independent Publishing Platform
  • Publish Date: August 2017
  • Dimensions: 11.02 x 8.5 x 0.18 inches
  • Shipping Weight: 0.5 pounds
  • Page Count: 88

Related Categories

You May Also Like...

    1

BAM Customer Reviews