menu
{ "item_title" : "Construction Phase Risk Control for Municipal Sewer", "item_author" : [" Mirza Sabir Baig "], "item_description" : "Construction Phase Risk Control for Municipal Sewer and Underground Utility Projects is a practical guide to managing uncertainty during field execution. It focuses on groundwater and dewatering, excavation and temporary works, utility conflicts, Subsurface Utility Engineering, construction sequencing, rehabilitation methods, quality control, changed conditions, documentation, and decision traceability. The book introduces the Construction Risk Control Loop: Detect, Verify, Assess, Decide, Control, Validate, and Document. It is written for construction managers, municipal owners, inspectors, contractors, designers, utility coordinators, and other infrastructure professionals who need a clear method for turning field observations into controlled, documented decisions before problems become delays, defects, rework, or avoidable risk.", "item_img_path" : "https://covers2.booksamillion.com/covers/bam/6/63/049/706/6630497066_b.jpg", "price_data" : { "retail_price" : "77.00", "online_price" : "77.00", "our_price" : "77.00", "club_price" : "77.00", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Construction Phase Risk Control for Municipal Sewer|Mirza Sabir Baig

Construction Phase Risk Control for Municipal Sewer

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

Construction Phase Risk Control for Municipal Sewer and Underground Utility Projects is a practical guide to managing uncertainty during field execution. It focuses on groundwater and dewatering, excavation and temporary works, utility conflicts, Subsurface Utility Engineering, construction sequencing, rehabilitation methods, quality control, changed conditions, documentation, and decision traceability. The book introduces the Construction Risk Control Loop: Detect, Verify, Assess, Decide, Control, Validate, and Document. It is written for construction managers, municipal owners, inspectors, contractors, designers, utility coordinators, and other infrastructure professionals who need a clear method for turning field observations into controlled, documented decisions before problems become delays, defects, rework, or avoidable risk.

This item is Non-Returnable

Details

  • ISBN-13: 9786630497069
  • ISBN-10: 6630497066
  • Publisher: LAP Lambert Academic Publishing
  • Publish Date: September 2026
  • Dimensions: 9 x 6 x 0.29 inches
  • Shipping Weight: 0.39 pounds
  • Page Count: 124

Related Categories

You May Also Like...

    1

BAM Customer Reviews