menu
{ "item_title" : "Data Center Mep Design Review Series Crah & Crac Design Review Checklist", "item_author" : [" Charles Nehme "], "item_description" : "Computer Room Air Handler (CRAH) and Computer Room Air Conditioner (CRAC) units are the workhorses of data center cooling. Whether chilled-water CRAHs served by a central plant or self-contained DX CRACs with integral compressors, these units determine whether IT equipment sees stable inlet temperature and humidity - or whether it doesn't. A poorly specified or poorly commissioned unit can undermine an otherwise well-engineered mechanical system.This checklist is built for use at three points in a project: design review (does the specification and layout make sense before it is built), factory/field acceptance (does the equipment as delivered match the design intent), and operational readiness (is the unit ready to be trusted with a live load). Each chapter maps to one of nine review domains that recur across nearly every CRAH/CRAC deployment, regardless of manufacturer.", "item_img_path" : "https://covers2.booksamillion.com/covers/bam/9/79/819/082/9798190821017_b.jpg", "price_data" : { "retail_price" : "49.99", "online_price" : "49.99", "our_price" : "49.99", "club_price" : "49.99", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Data Center Mep Design Review Series Crah & Crac Design Review Checklist|Charles Nehme

Data Center Mep Design Review Series Crah & Crac Design Review Checklist : Airflow - Coil Selection - Fan Redundancy - EC Fans Humidification - Drain D

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

Computer Room Air Handler (CRAH) and Computer Room Air Conditioner (CRAC) units are the workhorses of data center cooling. Whether chilled-water CRAHs served by a central plant or self-contained DX CRACs with integral compressors, these units determine whether IT equipment sees stable inlet temperature and humidity - or whether it doesn't. A poorly specified or poorly commissioned unit can undermine an otherwise well-engineered mechanical system.

This checklist is built for use at three points in a project: design review (does the specification and layout make sense before it is built), factory/field acceptance (does the equipment as delivered match the design intent), and operational readiness (is the unit ready to be trusted with a live load). Each chapter maps to one of nine review domains that recur across nearly every CRAH/CRAC deployment, regardless of manufacturer.


This item is Non-Returnable

Details

  • ISBN-13: 9798190821017
  • ISBN-10: 9798190821017
  • Publisher: Independently Published
  • Publish Date: August 2026
  • Dimensions: 9 x 6 x 0.19 inches
  • Shipping Weight: 0.22 pounds
  • Page Count: 72

Related Categories

You May Also Like...

    1

BAM Customer Reviews