menu
{ "item_title" : "Development and Calibration of Two-Dimensional Hydrodynamic Model of the Tanana River Near Tok, Alaska", "item_author" : [" Jeffrey S. Conaway", "Edward H. Moran", "United U. S. Department of the Interior "], "item_description" : "Bathymetric and hydraulic data were collected by the U.S. Geological Survey on the Tanana River in proximity to Alaska Department of Transportation and Public Facilities' bridge number 505 at mile 80.5 of the Alaska Highway. Data were collected from August 7-9, 2002, over an approximate 5,000- foot reach of the river. These data were combined with topographic data provided by Alaska Department of Transportation and Public Facilities to generate a two-dimensional hydrodynamic model. The hydrodynamic model was calibrated with water-surface elevations, flow velocities, and flow directions collected at a discharge of 25,600 cubic feet per second. The calibrated model was then used for a simulation of the 100-year recurrence interval discharge of 51,900 cubic feet per second. The existing bridge piers were removed from the model geometry in a second simulation to model the hydraulic conditions in the channel without the piers' influence. The water-surface elevations, flow velocities, and flow directions from these simulations can be used to evaluate the influence of the piers on flow hydraulics and will assist the Alaska Department of Transportation and Public Facilities in the design of a replacement bridge.", "item_img_path" : "https://covers1.booksamillion.com/covers/bam/1/28/872/295/1288722958_b.jpg", "price_data" : { "retail_price" : "14.75", "online_price" : "14.75", "our_price" : "14.75", "club_price" : "14.75", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Development and Calibration of Two-Dimensional Hydrodynamic Model of the Tanana River Near Tok, Alaska|Jeffrey S. Conaway

Development and Calibration of Two-Dimensional Hydrodynamic Model of the Tanana River Near Tok, Alaska : Usgs Open-File Report 2004-1225

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

Bathymetric and hydraulic data were collected by the U.S. Geological Survey on the Tanana River in proximity to Alaska Department of Transportation and Public Facilities' bridge number 505 at mile 80.5 of the Alaska Highway. Data were collected from August 7-9, 2002, over an approximate 5,000- foot reach of the river. These data were combined with topographic data provided by Alaska Department of Transportation and Public Facilities to generate a two-dimensional hydrodynamic model. The hydrodynamic model was calibrated with water-surface elevations, flow velocities, and flow directions collected at a discharge of 25,600 cubic feet per second. The calibrated model was then used for a simulation of the 100-year recurrence interval discharge of 51,900 cubic feet per second. The existing bridge piers were removed from the model geometry in a second simulation to model the hydraulic conditions in the channel without the piers' influence. The water-surface elevations, flow velocities, and flow directions from these simulations can be used to evaluate the influence of the piers on flow hydraulics and will assist the Alaska Department of Transportation and Public Facilities in the design of a replacement bridge.

This item is Non-Returnable

Customers Also Bought

Details

  • ISBN-13: 9781288722952
  • ISBN-10: 1288722958
  • Publisher: Bibliogov
  • Publish Date: February 2013
  • Dimensions: 9.69 x 7.44 x 0.05 inches
  • Shipping Weight: 0.15 pounds
  • Page Count: 26

Related Categories

You May Also Like...

    1

BAM Customer Reviews