menu
{ "item_title" : "Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility", "item_author" : [" Nasa Technical Reports Server (Ntrs) "], "item_description" : "Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.", "item_img_path" : "https://covers1.booksamillion.com/covers/bam/1/28/912/074/1289120749_b.jpg", "price_data" : { "retail_price" : "15.75", "online_price" : "15.75", "our_price" : "15.75", "club_price" : "15.75", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility|Nasa Technical Reports Server (Ntrs)

Electromagnetic Interference/Compatibility (EMI/EMC) Control Test and Measurement Facility : User Test Planning Guide

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

Test process, milestones and inputs are unknowns to first-time users of the EMI/EMC Test Facility. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

This item is Non-Returnable

Details

  • ISBN-13: 9781289120740
  • ISBN-10: 1289120749
  • Publisher: Bibliogov
  • Publish Date: June 2013
  • Dimensions: 9.69 x 7.44 x 0.08 inches
  • Shipping Weight: 0.19 pounds
  • Page Count: 38

Related Categories

You May Also Like...

    1

BAM Customer Reviews