menu
{ "item_title" : "Engineer Intelligence Bulletin No. 1", "item_author" : [" Headquarters Eighth Ar Engineer Section "], "item_description" : "The Eighth Army Engineer intelligence bulletin is a compilation of developments in engineer material, methods, and equipment, both friendly and enemy, gathered from operational areas in this theater (WWII). Its sole purpose is to provide engineer personnel with intelligence data for their future use and application. Bulletin 1 contents from April 1945 include information on: Japanese progress in defensive warfare; a Japanese road block; methods of mining a road; Castellegos airstrip mined by the Japanese; new Japanese single-horn beach mine; Japanese bridge demolitions; Japanese water supply equipment; temporary LST jetty; replacement of bridge with minimum interruption of traffic; placement of intermediate timber bents to reinforce small bridges; mud shoes; engineer photographs; and the schistosome- new engineer enemy.", "item_img_path" : "https://covers4.booksamillion.com/covers/bam/1/28/857/543/1288575432_b.jpg", "price_data" : { "retail_price" : "15.75", "online_price" : "15.75", "our_price" : "15.75", "club_price" : "15.75", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Engineer Intelligence Bulletin No. 1|Headquarters Eighth Ar Engineer Section

Engineer Intelligence Bulletin No. 1

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

The Eighth Army Engineer intelligence bulletin is a compilation of developments in engineer material, methods, and equipment, both friendly and enemy, gathered from operational areas in this theater (WWII). Its sole purpose is to provide engineer personnel with intelligence data for their future use and application. Bulletin 1 contents from April 1945 include information on: Japanese progress in defensive warfare; a Japanese road block; methods of mining a road; Castellegos airstrip mined by the Japanese; new Japanese single-horn beach mine; Japanese bridge demolitions; Japanese water supply equipment; temporary LST jetty; replacement of bridge with minimum interruption of traffic; placement of intermediate timber bents to reinforce small bridges; mud shoes; engineer photographs; and the schistosome- new engineer enemy.

This item is Non-Returnable

Details

  • ISBN-13: 9781288575435
  • ISBN-10: 1288575432
  • Publisher: Bibliogov
  • Publish Date: January 2013
  • Dimensions: 9.69 x 7.44 x 0.06 inches
  • Shipping Weight: 0.15 pounds
  • Page Count: 28

Related Categories

You May Also Like...

    1

BAM Customer Reviews