Estimating Performance Time for Air Force Military Construction Projects
Overview
The prediction of construction time performance is a problem of interest to both researchers and construction industry practitioners. This research seeks toidentify significant factors which may influence construction durations for Air Force Military Construction (MILCON) projects to establish a time predictionmodel. Data were collected for 856 MILCON projects completed between 1988 and 2004; this included both traditional facility and non-facility (e.g. airfieldpavements, utilities) projects. These data were analyzed using Bromilow's time-cost (BTC) model (1969) as well as multiple linear regression. Neither modelproduced acceptable results for non-facility projects; however, the multiple linear regression model was found to provide the most acceptable time predictionmodel for facility projects.As with the BTC model and previous research reported in the literature, there was a significant correlation between cost and duration. However, severalother factors were also identified that resulted in significantly lower than average construction durations.
This item is Non-Returnable
Customers Also Bought
Details
- ISBN-13: 9781288397778
- ISBN-10: 1288397771
- Publisher: Biblioscholar
- Publish Date: December 2012
- Dimensions: 9.21 x 6.14 x 0.49 inches
- Shipping Weight: 0.73 pounds
- Page Count: 232
Related Categories
