menu
{ "item_title" : "Independent Verification of the Mitigating Systems Performance Index (MSPI) Results for the Pilot Plants", "item_author" : [" U. S. Nuclear Regulatory Commission "], "item_description" : "In its Reactor Oversight Process (ROP), the U.S. Nuclear Regulatory Commission (NRC) currently uses performance indicators to quantify safety system unavailability (SSU) for four important nuclear power plant systems. Over time, the NRC staff has identified a number of concerns related to the use of these indicators, including the use of short-term unavailability to approximate unreliability, the use of generic performance thresholds irrespective of variations in risk significance, and potential double-counting as a result of support system failures cascading onto front line systems. Moreover, the way the SSU indicators currently measure unavailability is inconsistent with the definition in the NRC's Maintenance Rule, as well as the indicators promulgated by the World Association of Nuclear Operators and the Institute of Nuclear Power Operations.", "item_img_path" : "https://covers1.booksamillion.com/covers/bam/1/50/013/998/150013998X_b.jpg", "price_data" : { "retail_price" : "18.99", "online_price" : "18.99", "our_price" : "18.99", "club_price" : "18.99", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Independent Verification of the Mitigating Systems Performance Index (MSPI) Results for the Pilot Plants|U. S. Nuclear Regulatory Commission

Independent Verification of the Mitigating Systems Performance Index (MSPI) Results for the Pilot Plants

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

In its Reactor Oversight Process (ROP), the U.S. Nuclear Regulatory Commission (NRC) currently uses performance indicators to quantify safety system unavailability (SSU) for four important nuclear power plant systems. Over time, the NRC staff has identified a number of concerns related to the use of these indicators, including the use of short-term unavailability to approximate unreliability, the use of generic performance thresholds irrespective of variations in risk significance, and potential double-counting as a result of support system failures cascading onto front line systems. Moreover, the way the SSU indicators currently measure unavailability is inconsistent with the definition in the NRC's Maintenance Rule, as well as the indicators promulgated by the World Association of Nuclear Operators and the Institute of Nuclear Power Operations.

This item is Non-Returnable

Customers Also Bought

Details

  • ISBN-13: 9781500139988
  • ISBN-10: 150013998X
  • Publisher: Createspace Independent Publishing Platform
  • Publish Date: June 2014
  • Dimensions: 11.02 x 8.5 x 0.47 inches
  • Shipping Weight: 1.17 pounds
  • Page Count: 224

Related Categories

You May Also Like...

    1

BAM Customer Reviews