{
"item_title" : "An Introduction to Oil-Filled Transformer Inspection for Professional Engineers",
"item_author" : [" J. Paul Guyer "],
"item_description" : "Introductory technical guidance for professional engineers interested in inspection of oil filled electric transformers. Here is what is discussed: 1. INTRODUCTION, 2. TRANSFORMER TANK, 3. TOP OIL THERMOMETERS, 4. WINDING TEMPERATURE THERMOMETERS, 5. OIL LEVEL INDICATORS, 6. PRESSURE RELIEF DEVICES, 7. SUDDEN PRESSURE RELAY, 8. BUCHHOLZ RELAY, 9. TRANSFORMER BUSHINGS: TESTING AND MAINTENANCE OF HIGH-VOLTAGE BUSHINGS, 10. OIL PRESERVATION SEALING SYSTEMS, 11. AUXILIARY TANK SEALING SYSTEM.",
"item_img_path" : "https://covers3.booksamillion.com/covers/bam/9/79/839/840/9798398400014_b.jpg",
"price_data" : {
"retail_price" : "37.99", "online_price" : "37.99", "our_price" : "37.99", "club_price" : "37.99", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : ""
}
}
An Introduction to Oil-Filled Transformer Inspection for Professional Engineers
Overview
Introductory technical guidance for professional engineers interested in inspection of oil filled electric transformers. Here is what is discussed: 1. INTRODUCTION, 2. TRANSFORMER TANK, 3. TOP OIL THERMOMETERS, 4. WINDING TEMPERATURE THERMOMETERS, 5. OIL LEVEL INDICATORS, 6. PRESSURE RELIEF DEVICES, 7. SUDDEN PRESSURE RELAY, 8. BUCHHOLZ RELAY, 9. TRANSFORMER BUSHINGS: TESTING AND MAINTENANCE OF HIGH-VOLTAGE BUSHINGS, 10. OIL PRESERVATION SEALING SYSTEMS, 11. AUXILIARY TANK SEALING SYSTEM.
This item is Non-Returnable
Customers Also Bought
Details
- ISBN-13: 9798398400014
- ISBN-10: 9798398400014
- Publisher: Independently Published
- Publish Date: June 2023
- Dimensions: 11 x 8.5 x 0.13 inches
- Shipping Weight: 0.41 pounds
- Page Count: 50
Related Categories
