{ "item_title" : "Investigation of Riser Disconnect and Spill Green Canyon Block 652 OCS-F 21810", "item_author" : [" U. S. Department of the Interior "], "item_description" : "On July 5, 2005, an unplanned riser disconnect was initiated on the Ensco 7500 semi-submersible rig, which had been engaged in exploratory drilling activities, because of unfavorable sea and wind conditions associated with an approaching tropical depression. While the riser volume was being displaced with seawater in preparation for the disconnect operation, the rig was no longer able to maintain station adequately enough to complete the operation. As a result, the riser was disconnected from the Lower Marine Riser Package (LMRP), at which time 710 barrels of synthetic-based mud was released from the riser into the GOM. At the time of the disconnect, there were no open hole hydrocarbons exposed below the casing depth.", "item_img_path" : "https://covers4.booksamillion.com/covers/bam/1/50/332/788/1503327884_b.jpg", "price_data" : { "retail_price" : "15.99", "online_price" : "15.99", "our_price" : "15.99", "club_price" : "15.99", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Investigation of Riser Disconnect and Spill Green Canyon Block 652 OCS-F 21810|U. S. Department of the Interior

Investigation of Riser Disconnect and Spill Green Canyon Block 652 OCS-F 21810

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

On July 5, 2005, an unplanned riser disconnect was initiated on the Ensco 7500 semi-submersible rig, which had been engaged in exploratory drilling activities, because of unfavorable sea and wind conditions associated with an approaching tropical depression. While the riser volume was being displaced with seawater in preparation for the disconnect operation, the rig was no longer able to maintain station adequately enough to complete the operation. As a result, the riser was disconnected from the Lower Marine Riser Package (LMRP), at which time 710 barrels of synthetic-based mud was released from the riser into the GOM. At the time of the disconnect, there were no open hole hydrocarbons exposed below the casing depth.

This item is Non-Returnable

Details

  • ISBN-13: 9781503327887
  • ISBN-10: 1503327884
  • Publisher: Createspace Independent Publishing Platform
  • Publish Date: January 2015
  • Dimensions: 11.02 x 8.5 x 0.07 inches
  • Shipping Weight: 0.24 pounds
  • Page Count: 36

Related Categories

You May Also Like...

    1

BAM Customer Reviews