menu
{ "item_title" : "The Plant", "item_author" : [" Empire Publishing "], "item_description" : "The projections say decline.The control rooms say otherwise.Here is a paradox worth a career: government projections show power plant operator headcount declining - and yet plants are hiring, urgently. Median pay is $102,040 (2025), about 31,600 people hold the job, roughly 2,500 openings appear each year, and 60% of entrants start with a high-school diploma (O*NET/BLS 51-8013 family, hand-verified).The resolution of the paradox is replacement. NERC's 2025 Long-Term Reliability Assessment documents record load growth - a 224 GW summer peak and tens of gigawatts of gas in interconnection queues - while the industry's own workforce body has documented an aging-operator cliff for years. Fewer total seats; a constant stream of empty ones.This book is the career path the exam-prep shelf skips: how the auxiliary-operator to control-room-operator qualification ladder actually works, how to choose a plant type (peaker, combined-cycle, hydro) and what each does to your life, how Navy machinist and electrician watchstanding converts, and how the federal civil-service route - TVA, USACE, Reclamation - differs from investor-owned utilities.It is honest about the industry's direction: this is a replacement-hiring and life-extension market, not a growth story, and the book says so with the LTRA's own numbers. That honesty is exactly why the opportunity is real - almost nobody under forty is applying.Licensing is jurisdiction-specific and signposted: stationary-engineer and boiler licences are city- and state-level where they exist, some roles require NERC certification, and federal hiring runs on its own civil-service rules. An Australian appendix covers state plant-operations licensing separately - nothing ports.Everyone is chasing new industries. The old one pays six figures and cannot find you.", "item_img_path" : "https://covers2.booksamillion.com/covers/bam/9/79/819/140/9798191407753_b.jpg", "price_data" : { "retail_price" : "17.99", "online_price" : "17.99", "our_price" : "17.99", "club_price" : "17.99", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
The Plant|Empire Publishing

The Plant : From Auxiliary Operator to the Control Room - Navigating a Replacement-Hiring Market in Power Generation (A Field Guide)

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

The projections say decline.
The control rooms say otherwise.

Here is a paradox worth a career: government projections show power plant operator headcount declining - and yet plants are hiring, urgently. Median pay is $102,040 (2025), about 31,600 people hold the job, roughly 2,500 openings appear each year, and 60% of entrants start with a high-school diploma (O*NET/BLS 51-8013 family, hand-verified).

The resolution of the paradox is replacement. NERC's 2025 Long-Term Reliability Assessment documents record load growth - a 224 GW summer peak and tens of gigawatts of gas in interconnection queues - while the industry's own workforce body has documented an aging-operator cliff for years. Fewer total seats; a constant stream of empty ones.

This book is the career path the exam-prep shelf skips: how the auxiliary-operator to control-room-operator qualification ladder actually works, how to choose a plant type (peaker, combined-cycle, hydro) and what each does to your life, how Navy machinist and electrician watchstanding converts, and how the federal civil-service route - TVA, USACE, Reclamation - differs from investor-owned utilities.

It is honest about the industry's direction: this is a replacement-hiring and life-extension market, not a growth story, and the book says so with the LTRA's own numbers. That honesty is exactly why the opportunity is real - almost nobody under forty is applying.

Licensing is jurisdiction-specific and signposted: stationary-engineer and boiler licences are city- and state-level where they exist, some roles require NERC certification, and federal hiring runs on its own civil-service rules. An Australian appendix covers state plant-operations licensing separately - nothing ports.

Everyone is chasing new industries. The old one pays six figures and cannot find you.

This item is Non-Returnable

Details

  • ISBN-13: 9798191407753
  • ISBN-10: 9798191407753
  • Publisher: Independently Published
  • Publish Date: August 2026
  • Dimensions: 9 x 6 x 0.3 inches
  • Shipping Weight: 0.43 pounds
  • Page Count: 138

Related Categories

You May Also Like...

    1

BAM Customer Reviews