menu
{ "item_title" : "Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)", "item_author" : [" The Law Library "], "item_description" : "Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 The Federal Energy Regulatory Commission (Commission) is eliminating the exemptions for wind generators from the requirement to provide reactive power by revising the pro forma Large Generator Interconnection Agreement (LGIA), Appendix G to the pro forma LGIA, and the pro forma Small Generator Interconnection Agreement (SGIA). As a result, all newly interconnecting non-synchronous generators will be required to provide reactive power at the high-side of the generator substation as a condition of interconnection as set forth in their LGIA or SGIA as of the effective date of this Final Rule. This book contains: - The complete text of the Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section", "item_img_path" : "https://covers1.booksamillion.com/covers/bam/1/72/787/392/1727873920_b.jpg", "price_data" : { "retail_price" : "19.90", "online_price" : "19.90", "our_price" : "19.90", "club_price" : "19.90", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)|The Law Library

Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition)

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) The Law Library presents the complete text of the Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition). Updated as of May 29, 2018 The Federal Energy Regulatory Commission (Commission) is eliminating the exemptions for wind generators from the requirement to provide reactive power by revising the pro forma Large Generator Interconnection Agreement (LGIA), Appendix G to the pro forma LGIA, and the pro forma Small Generator Interconnection Agreement (SGIA). As a result, all newly interconnecting non-synchronous generators will be required to provide reactive power at the high-side of the generator substation as a condition of interconnection as set forth in their LGIA or SGIA as of the effective date of this Final Rule. This book contains: - The complete text of the Reactive Power Requirements for Non-Synchronous Generation (US Federal Energy Regulatory Commission Regulation) (FERC) (2018 Edition) - A table of contents with the page number of each section

This item is Non-Returnable

Customers Also Bought

Details

  • ISBN-13: 9781727873924
  • ISBN-10: 1727873920
  • Publisher: Createspace Independent Publishing Platform
  • Publish Date: October 2018
  • Dimensions: 10 x 7 x 0.09 inches
  • Shipping Weight: 0.2 pounds
  • Page Count: 42

Related Categories

You May Also Like...

    1

BAM Customer Reviews