menu
{ "item_title" : "Resource-Constrained Project Scheduling", "item_author" : [" Christian Artigues", "Sophie Demassey", "Emmanuel Néron "], "item_description" : "Presenting  a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims  to schedule  at minimal duration a set of activities subject to precedence constraints and limited resource availabilities, this  book  tackles three main  issues.  First, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. The second part focuses on several other variants of the RCPSP and on their solution methods. Lastly, industrial case studies are presented where the RCPSP plays a central part.", "item_img_path" : "https://covers2.booksamillion.com/covers/bam/1/84/821/034/1848210345_b.jpg", "price_data" : { "retail_price" : "197.95", "online_price" : "197.95", "our_price" : "197.95", "club_price" : "197.95", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Resource-Constrained Project Scheduling|Christian Artigues

Resource-Constrained Project Scheduling : Models, Algorithms, Extensions and Applications

local_shippingShip to Me
On Order. Usually ships in 2-4 weeks
FREE Shipping for Club Members help

Overview

Presenting  a large variety of models and algorithms dedicated to the resource-constrained project scheduling problem (RCPSP), which aims  to schedule  at minimal duration a set of activities subject to precedence constraints and limited resource availabilities, this  book  tackles three main  issues.  First, the standard variant of RCPSP is presented and analyzed as a combinatorial optimization problem. The second part focuses on several other variants of the RCPSP and on their solution methods. Lastly, industrial case studies are presented where the RCPSP plays a central part.

This item is Non-Returnable

Details

  • ISBN-13: 9781848210349
  • ISBN-10: 1848210345
  • Publisher: Wiley-Iste
  • Publish Date: April 2008
  • Dimensions: 9.27 x 6.38 x 0.92 inches
  • Shipping Weight: 1.33 pounds
  • Page Count: 288

Related Categories

You May Also Like...

    1

BAM Customer Reviews