menu
{ "item_title" : "Use of Critical Chain Scheduling to Increase Aircraft Availability", "item_author" : [" Daniel D. Mattioda "], "item_description" : "United States Air Force Special Operations Command (AFSOC) has a minimal number of aircraft at its disposal. As a result, the aircraft are considered high demand, low-density (small number in Air Force inventory) weapon systems. Any chance to increase aircraft availability would greatly enhance the capability of AFSOC. Isochronal maintenance (ISO) conducted once every 365 days (per AFI for C- 130 aircraft) provides the best opportunity to increase aircraft availability by improving the scheduling of tasks and accurately estimating the inspection duration. Scheduled maintenance portrays the characteristics of projects, therefore, this thesis proposed that Critical Chain (CC) scheduling, a project management technique, could provide an improved ISO schedule reducing aircraft downtime.", "item_img_path" : "https://covers4.booksamillion.com/covers/bam/1/28/839/732/1288397321_b.jpg", "price_data" : { "retail_price" : "57.95", "online_price" : "57.95", "our_price" : "57.95", "club_price" : "57.95", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Use of Critical Chain Scheduling to Increase Aircraft Availability|Daniel D. Mattioda

Use of Critical Chain Scheduling to Increase Aircraft Availability

local_shippingShip to Me
On Order. Usually ships in 2-4 weeks
FREE Shipping for Club Members help

Overview

United States Air Force Special Operations Command (AFSOC) has a minimal number of aircraft at its disposal. As a result, the aircraft are considered high demand, low-density (small number in Air Force inventory) weapon systems. Any chance to increase aircraft availability would greatly enhance the capability of AFSOC. Isochronal maintenance (ISO) conducted once every 365 days (per AFI for C- 130 aircraft) provides the best opportunity to increase aircraft availability by improving the scheduling of tasks and accurately estimating the inspection duration. Scheduled maintenance portrays the characteristics of projects, therefore, this thesis proposed that Critical Chain (CC) scheduling, a project management technique, could provide an improved ISO schedule reducing aircraft downtime.

This item is Non-Returnable

Details

  • ISBN-13: 9781288397327
  • ISBN-10: 1288397321
  • Publisher: Biblioscholar
  • Publish Date: December 2012
  • Dimensions: 9.69 x 7.44 x 0.27 inches
  • Shipping Weight: 0.53 pounds
  • Page Count: 126

Related Categories

You May Also Like...

    1

BAM Customer Reviews