{ "item_title" : "Live Fire Testing", "item_author" : [" U. S. Government Accountability Office ( "], "item_description" : "In response to a congressional request, GAO reviewed the Department of Defense (DOD) Joint Live Fire (JLF) Test Program to determine: (1) the status of each munition and system scheduled for testing; (2) the methodological quality of the test and evaluation process; (3) the advantages and limitations of full-up, live-fire testing; and (4) needed improvements. GAO found that: (1) the JLF tests for armor were two years behind schedule due to a controversy over objectives and methodology; (2) although the aircraft testing program has suffered less severe delays, a lack of targets is a problem for both components; (3) DOD has made little progress in validating its vulnerability/lethality (V/L) assessment program estimates; (4) full-up, live-fire testing is the only V/L assessment method that provides direct visual observation of weapon damage to a target under realistic conditions; (5) high cost and the limited target availability are the main limitations to testing; and (6) other test methods could supplement full-up, full-scale testing, but not substitute for it. GAO identified possible improvements in the design, conduct, and interpretation of live-fire testing.", "item_img_path" : "https://covers3.booksamillion.com/covers/bam/1/28/726/053/1287260535_b.jpg", "price_data" : { "retail_price" : "21.75", "online_price" : "21.75", "our_price" : "21.75", "club_price" : "21.75", "savings_pct" : "0", "savings_amt" : "0.00", "club_savings_pct" : "0", "club_savings_amt" : "0.00", "discount_pct" : "10", "store_price" : "" } }
Live Fire Testing|U. S. Government Accountability Office (

Live Fire Testing : Evaluating DOD's Programs: PEMD-87-17

local_shippingShip to Me
In Stock.
FREE Shipping for Club Members help

Overview

In response to a congressional request, GAO reviewed the Department of Defense (DOD) Joint Live Fire (JLF) Test Program to determine: (1) the status of each munition and system scheduled for testing; (2) the methodological quality of the test and evaluation process; (3) the advantages and limitations of full-up, live-fire testing; and (4) needed improvements.
GAO found that: (1) the JLF tests for armor were two years behind schedule due to a controversy over objectives and methodology; (2) although the aircraft testing program has suffered less severe delays, a lack of targets is a problem for both components; (3) DOD has made little progress in validating its vulnerability/lethality (V/L) assessment program estimates; (4) full-up, live-fire testing is the only V/L assessment method that provides direct visual observation of weapon damage to a target under realistic conditions; (5) high cost and the limited target availability are the main limitations to testing; and (6) other test methods could supplement full-up, full-scale testing, but not substitute for it. GAO identified possible improvements in the design, conduct, and interpretation of live-fire testing.

This item is Non-Returnable

Details

  • ISBN-13: 9781287260530
  • ISBN-10: 1287260535
  • Publisher: Bibliogov
  • Publish Date: July 2013
  • Dimensions: 9.69 x 7.44 x 0.36 inches
  • Shipping Weight: 0.69 pounds
  • Page Count: 170

Related Categories

You May Also Like...

    1

BAM Customer Reviews